We handle the regulatory complexity
Almost every permanent exterior sign needs a permit, and every municipality has its own rules for size, height, setback, illumination, and number of signs. Getting it wrong means redesigns, delays, and sometimes a sign that has to come down. We research local code requirements and signage allowances up front to determine sign sizes and types — and we handle all the regulatory paperwork.
Our permitting process
- Site visit. We survey the property: frontage, setbacks, existing signs, power, and sight lines.
- Research. We research local code requirements and signage allowances for your location.
- Design to code. Preliminary designs are created around what’s allowed — where creativity meets compliance.
- Paperwork. Site plan, production designs, and required paperwork are completed to submit permits, generally within one week of receiving your deposit.
- Revisions. If permitting requires changes, they’re approved by you before we proceed.
- Release to production. Once permits are received, your project moves into our shop.
Across three states
Our shop sits in Steubenville, with Ohio, West Virginia, and Pennsylvania all within a short drive. Our team understands zoning regulations and municipal code requirements throughout Eastern Ohio, Wheeling, WV, and Western PA — so your project moves forward without delays.
See how permitting fits into the full project on our process page.
What we build and handle
- Site visits and surveys
- Local sign code research
- Sign allowance calculations
- Site plans and production drawings
- Permit application preparation and submittal
- Coordination with landlords and property owners
- Revisions requested by the permit office
Who we build them for
Business ownersProperty managersFranchiseesGeneral contractorsInstitutionsMulti-location brands

Frequently asked questions
How long does it take to submit a sign permit?
Site plan, production designs, and required paperwork are completed and submitted generally within one week of receiving your deposit. Approval time depends on the municipality.
What happens if the permit office requires changes?
If permitting requires changes, we bring them to you for approval first, then update the design and resubmit.
Do you know the sign rules in my town?
Our team researches zoning and municipal code requirements throughout Eastern Ohio, Wheeling, WV, and Western PA on every project, so your sign is designed to what your municipality actually allows.
Sign Permitting & Site Surveys across the Ohio Valley
Every project is designed, fabricated, and installed by our team out of 356 Technology Way, Steubenville, OH. We work throughout Steubenville, OH, Wintersville, OH, Weirton, WV, Wheeling, WV, and Pittsburgh, PA, plus the surrounding Eastern Ohio, Northern West Virginia, and Western Pennsylvania communities.